Tuesday, July 16, 2013




Hello EcoDancer peeps,
Since I last posted, a lot has been accomplished. We built aluminum frames for the dwelling room and dance room windows.
WINDOWS:



We installed container door locks on the hinged walls.
 HINGED WALL DOOR LOCKS



I installed a door from the parts RV.
RV DOOR INSTALL



Lastly, we riveted aluminum to the SIP seams, the roof and the roof/wall corners. This part was a wonderful goopy mess, thanks to 7 sausages of Sikoflex, an industrial waterproofing glue. WATERPROOFING THE EXTERIOR





Our final step last week was to move out. Our time is up at the Open Space's warehouse. So we packed up the tools, the remaining SIP panels (that are the unattached stage corners), and exited through the only ground level garage door. This was a 6 hour process because we had to see-saw Foxy out of the warehouse in order to turn her to face the truck. See-sawing was done in parts by hand, fork lift, and truck. But, phew! We made it out. Thank you Open Space! We are safely relocated to our third build location, yet another backyard. 

Now I am on to finishing the back end. This part is tricky because it is where stage legs, door locks, waterproofing materials and holding devices for the extra stage panels converge. I'll spare you the details until I have images to illustrate all this nonsense clearly. Over and out for now.  -Hallie